17 | PageRev C | 1/22/20
Step 1 Put the fi rst cabinet in place. Loosen the toe kick bolts to adjust the gap between the
toe kick and cabinet sides and insert shims as necessary for leveling. We recommend
that you level each cabinet as you go, but don't tighten the toe kick bolts until all the
cabinets have been installed. Attach the cabinet to the Instant Walls with 1/4-20 bolts,
or to your own walls with appropriate mounting hardware (not provided by Moduline).
Step 2 If the next section is a Countertop Brace see page 18.
If the next section is a Corner Filler see pages 19-21.
Otherwise, put the next cabinet in place and loosely bolt the cabinets together.
To add mounting holes to a closet, drill through the holes in the adjacent cabinet.
Shim as necessary, then tighten the bolts between the cabinets.
Step 3 Repeat steps 1 & 2 until all your cabinet components have been installed.
Step 4 See page 22 for instructions on installing the countertops.
INSTALLING YOUR CABINETS
Shim
Transfering mounting
holes to a closet side
from an overhead