Page 11
Molnar 4 Post Hoist SM4X0
16. Shim the posts as required, drill concrete holes and install anchor bolts, fasten the nuts lightly.
NOTE! Shim up baseplates so that posts are vertical. As much baseplate surface should be in contact
with the floor as possible. Molnar recommends at least 50% surface to floor contact, especially in the
middle of the baseplate which must be in contact with the floor or shimmed.
Post Base Plate for Leveling available
- Part Number SM440-S-15
- Part Number SM450-S-15
- Part Number SM460-S-15