EasyManua.ls Logo

Moog RKP-II - Page 64

Moog RKP-II
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Demounting the Pump 9 Demounting
56 User Manual RKP-II (CA53461-001; Version 2, January 2010) © 2010 Moog GmbH
Pre-Conditions:
The pump is idle:
Ö Chap. "7.4 Placing the Pump out of Operation", Page 52
Demounting location is freely accessible.
Machine / equipment is at zero pressure and zero voltage.
Operating fluid has been inspected for risks and any necessary safety
precautions have been taken.
Standard tools are available.
Supplementary documentation is available.
Procedure:
1. Remove the electrical connections from the pump:
Ö Application Instruction RKP-D with CAN Bus Interface
2. Place the collecting tray for leaking operating fluid underneath the pump.
3. Remove the lines from the pump.
4. Completely drain the pump.
5. Attach the end caps and the flange covers to the pump.
6. Attach suitable lifting tackle to the pump.
Ö Chap. "5.2 Transporting the Pump", Page 29
7. Detach the pump with the coupling from the drive motor.
8. Place the pump onto a firm and stable surface.
9. Detach the lifting gear from the pump.
10. Detach the coupling from the pump's drive shaft in accordance with the
instructions provided by the coupling manufacturer.
11. Attach transport protection means for shaft ends to the pump's drive shaft.

Table of Contents

Related product manuals