EasyManua.ls Logo

Mopar Crate HEMI 392 - Component Instructions & Guidelines

Mopar Crate HEMI 392
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Crate HEMI® Engine Kit Instruction Sheet www.mopar.com
Rev Level 5.0 K6862625 6
Component Instructions & Guidelines
Accelerator Pedal
Follow accelerator pedal installation recommended guidelines below. Torque to 7 m (5 Ft. Lbs.).
Please refer to the Break-In/Maintenance section for the required pedal learn function.
Label
Description
Maximum Clearance
A
Clutch to Brake
-
B
Brake to Accelerator
80mm
C
Accelerator to Transmission Tunnel
-
D
Accelerator to Brake - Depth
47mm
Powertrain Control Module (PCM)
Fasten PCM using the 3 fastener locations on the
edges of the PCM. Do not over tighten fasteners
as damage may occur on PCM housing. This PCM
will not function in a current production vehicle.
Connect a ground cable to PCM housing.
The PCM and the engine harness PCM
connectors are environmentally sealed. This unit
can be mounted anywhere in the vehicle,
however it is not recommended to be installed
near hot locations such as the exhaust system,
on the engine, or high splash areas such as the
wheel wells. If routing the wiring harness
through the bulkhead or any sheet metal, a
grommet is required to prevent damage.