EasyManua.ls Logo

mori seiki ZL-253 User Manual

mori seiki ZL-253
561 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
OPERATION MANUAL
Applicable Model
ZL-153 ZL-153S
ZL-153MC ZL-153SMC
ZL-203 ZL-203S
ZL-203MC ZL-203SMC
ZL-253 ZL-253S
ZL-253MC ZL-253SMC
Before starting operation, maintenance, or programming, carefully read the
manuals supplied by Mori Seiki, the NC unit manufacturer, and equipment
manufacturers so that you fully understand the information they contain.
Keep the manuals carefully so that they will not be lost.
Applicable NC Unit
MSG-501
OM-ZLFMSG501-A0E

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the mori seiki ZL-253 and is the answer not in the manual?

mori seiki ZL-253 Specifications

General IconGeneral
Brandmori seiki
ModelZL-253
CategoryLathe
LanguageEnglish

Summary

FOR SAFE OPERATION

CONSIDERATIONS BEFORE OPERATING THE MACHINE

Cautions to be borne in mind when operating the machine.

DOOR INTERLOCK FUNCTION

3 PRECAUTIONS ON USING THE DOOR INTERLOCK FUNCTION

Lists items to carefully attend to when using the door interlock function.

MANUAL OPERATION

1 SAFETY GUIDELINES

General safety precautions to observe while operating the machine to prevent serious injury.

2 TURNING ON THE POWER

Details checks and procedures for turning on the machine's power.

3 EMERGENCY STOP

Explains methods to immediately stop machine operation during manual or automatic operation.

7 SPINDLE OPERATION

Describes spindle related operations, including spindle start and stop.

CHUCKING

1 CAUTIONS ON CHUCKING A WORKPIECE

Highlights important points to pay attention to when chucking a workpiece.

2 ADJUSTING THE PRESSURE

Describes procedures for adjusting chucking pressure and tailstock spindle thrust.

PROGRAM EDITING

4 PROGRAM EDITING

Covers alteration, insertion, and deletion of words and blocks in programs.

5 INPUTTING AND OUTPUTTING PROGRAMS USING AN EXTERNAL I/O DEVICE

Explains procedures for inputting/outputting programs using external devices like memory cards.

SETTING OF COORDINATE SYSTEM

4 SETTING THE TOOL COORDINATE SYSTEM WITH GEOMETRY OFFSET

Details setting tool coordinate systems using geometry offset data.

PREPARATION BEFORE STARTING MASS PRODUCTION

1 CONDITIONS FOR STARTING AUTOMATIC OPERATION

Lists conditions that must be met for starting automatic operation.

2 CHECK ITEMS WHEN EXECUTING DRY RUN, TEST CUTTING, MEASUREMENT, AND MASS PRODUCTION

Provides a checklist for dry run, test cutting, measurement, and mass production.

4 PROGRAM CHECK

Describes preparatory steps for checking a program.

6 CHECKING A PROGRAM WITHOUT CHUCKING A WORKPIECE

Details procedures for checking programs without a workpiece, using spindle OFF mode.

7 CHECKING THE PROGRAM WITH A WORKPIECE CLAMPED IN THE CHUCK

Explains how to check programs with a workpiece clamped, including coordinate system shifting.

9 LOAD MONITORING FUNCTION B

Explains operating and setting methods for the load monitoring function.

Related product manuals