5 Mounting
Maschinenfabrik Reinhausen GmbH 201826 1800059/09 ENRS
4. Press OPERATION test button.
ð Flap valve is vertical.
Figure9: OPERATION position
5. Position the wire for the terminal box cover and affix using the slotted
head screw.
Figure10: Terminal box cover