6 Assembly
11
6 Assembly
Assembly work may only be performed by qualified staff (see Chapter 2.2). The
control unit may only be operated after having installed in a fixed location.
INFORMATION
If the control unit falls down, it may no longer be used and must be returned to MRS
to be checked.
6.1 Mounting location
The mounting location must be selected as such that the control unit is subjected to
as low a mechanical and thermal load as possible. The control unit may not be
exposed to chemicals.
INFORMATION
Please observe the permissible environmental conditions in the data sheet.
6.2 Mounting position
Mount the control unit in such a way that the connectors point downwards. This
ensures that possible condensation water can flow off. Individual seals of the
cables/wires ensure that no water can enter the control unit.
6.3 Fastening
Control unit with flat plugs (pursuant to ISO 7588-1: 1998-09)
Control units with flat plugs are plugged into the plugs provided by the manufacturer
of the complete system. Please observe the instructions in Chapter 7 Electric
installation.
Control unit with fastening straps
The control unit must be screwed to the complete system at both side fastening
straps. The selection of the connecting elements, securing the connections and the
torque are determined by the manufacturer of the complete system. Please observe
the specified hole distance in the data sheet.
Control unit with boreholes
The control unit must be screwed to all boreholes of the casing of the complete
system. The selection of the connecting elements, securing the connections and the
torque are determined by the manufacturer of the complete system. Please observe
the specified hole distances in the data sheet.