EasyManua.ls Logo

MTU 12V 2000 C66 - Putting the Engine into Operation after Scheduled Out-Of-Service-Period

MTU 12V 2000 C66
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.2 Putting the engine into operation after scheduled out-of-
service-period
Preconditions
Engine is stopped and starting disabled.
Putting into operation
Item Action
Lube oil system Check engine oil level (→ Page 69).
Coolant circuit Check engine coolant level (→ Page 79), check charge-air coolant level
(→ Page 88).
Coolant circuit Preheat engine coolant with coolant preheating unit, if fitted.
Fuel prefilter (if fitted) Drain water and contaminants, see manufacturer's documentation.
Engine control system Switch on.
MS150094/01E 2012-08 | Operation | 23
TIM-ID: 0000010642 - 002

Table of Contents

Related product manuals