Do you have a question about the Mueller B-101 and is the answer not in the manual?
Details the B-101 Drilling and Tapping Machine's capabilities, mechanism, and recommended uses.
Lists the total shipping weight, handling weight, shipping length, and extended length of the machine.
Provides guidance on selecting the correct machine based on pipe size, capacity, and maximum pressure.
Lists common items inserted with the machine, specifying size and operation method (e.g., stops, plugs).
Outlines cleaning, lubrication, and inspection steps before operating the machine for safety and performance.
Details thorough cleaning, chip removal, and lubrication required after operating the machine.
Step-by-step instructions for removing and replacing O-ring packings in the boring bar assembly.
Explains the maintenance requirement for the automatic feed drill gear case, focusing on lubrication.
Describes how to operate the bypass valve for pressure relief and its periodic maintenance.
Guides users on selecting the appropriate tools, saddles, and accessories for the tapping operation.
Provides detailed steps for cleaning the pipe and securely attaching the drilling machine using saddles and chains.
Details how to insert and secure the combined drill and tap or shell cutter onto the boring bar.
Explains how to connect the boring bar assembly to the cylinder and prepare the machine for operation.
Step-by-step instructions for performing drilling and tapping using manual operation with the ratchet handle.
Provides instructions for drilling and tapping using an attached power operator (electric, air, or hydraulic).
Details the procedures for safely removing the drill and tap from the pipe after the operation is complete.
Guides on attaching the corporation stop or plug to the boring bar for insertion into the tapped hole.
Explains the process of inserting the stop or plug into the tapped hole in the main under pressure.
Describes how to release the screw plug after inserting the stop or plug, confirming connection tightness.
Outlines the steps for detaching and removing the machine, saddle, and gaskets from the pipe.
Details the procedure for removing an installed stop or plug from the pipe while it is under pressure.
Provides instructions for using the blow-off valve to manage pipe chips during pressure taps.
Step-by-step instructions for removing the bearing from the boring bar, including pin and screw removal.
Step-by-step instructions for installing a new bearing onto the bearing sleeve and reassembling.