20
Module Assembly
5. Place rst module on the rails.
6. Slide module into position.
7. Place subsequent modules onto rails.
8. Leave sucient space between modules to install
coupling gaskets.
9. Lubricate gaskets with solid vegetable shortening or
other non-petroleum based lubricant.
10. Slide modules together lining up footing holes. Install
bottom joining bolts.
11. Install top joining bolts.
12. Starting with the lower header, install pipe couplings. Position cou-
pling bolts at one and seven o’clock positions as shown for proper frame
installation. Note: Assure proper strainer placement.