EasyManua.ls Logo

Multistack MS050XC - Table of Contents

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Contents
Safety Information.....................................................................................................................................................................................3
Nameplate and Model Number Nomenclature..............................................................................................................................4
Chiller Arrangement and Components, Standard and Total Access™ Modules...............................................................5-7
General Data................................................................................................................................................................................................8
Shipping Information..........................................................................................................................................................................9-10
Clearances and Dimensions............................................................................................................................................................11-16
Piping, Flow Protection...........................................................................................................................................................................17
Pressure Relief Piping, Water Treatment Specications, Pipe Flushing.................................................................................18
Module Assembly, Standard Modules........................................................................................................................................19-21
Module Assembly, Total Access™ Modules......................................................................................................................................22
Multiush Assembly, Leak Testing......................................................................................................................................................23
Electrical Installation, Wiring, Electrical Data............................................................................................................................24-28
Frame and Enclosure Panel Installation............................................................................................................................................29
Installation Checklist................................................................................................................................................................................30
Start-Up Data Log...............................................................................................................................................................................31-32
Operation...............................................................................................................................................................................................33-34
Maintenance.........................................................................................................................................................................................34-36
Troubleshooting....................................................................................................................................................................................... 37
Daily Log................................................................................................................................................................................................38-39
This Multistack installation and operation manual will assist in the proper installation and operation of Multistack modular chillers. Review this
manual carefully.
The information and illustrations contained in this manual are generalized. Consult with a Multistack representative to address specic
installation and operating details not covered in this manual.
Good electrical and piping practices in accordance with all National and local codes must be followed.
This equipment must not be installed near an open ame per local codes and ASHRAE specications.
Personnel servicing Multistack modular chillers must have, at minimum, a Class II EPA certication.
Questions regarding the content of this manual and Multistack products should be directed to an authorized Multistack representative or
to the Multistack Service Department at: (608) 366-2400 or via e-mail to info@multistack.com
Planning Ahead
To ensure all warranties and a successful installation, a Factory Authorized Technician is required to perform start-up of the Multistack Chiller. If start-up
is to be performed directly by Multistack, a minimum of two weeks notice is required. Please call the Multistack Service Department at (608) 366-2400 to
schedule.
Multistack has a policy of continual improvement and reserves the right to change product design, literature and
specications without notice.
© 2016 Multistack
This manual provides information on the proper installation, operation and maintenance requirements for Multistack water-
cooled modular chillers. Follow these instructions to help ensure that the chiller performs properly. Failure to follow these in-
structions can signicantly aect the chillers performance and reliability and may adversely aect the equipment warranty.

Related product manuals