18
Subject to modications
Loader without MACH System:
— Remove the caps.
— Connect the hydraulic couplings.
— Open the valve.
— Raise and lock the right and left parking stands.
Check that each parking stand is correctly locked.
— Checks to be carried out before starting work:
put the tool in forced ground support (front wheels of
the tractor raised) to check the correct hitching of the loader.
Two-step hitching
1. Connect the hydraulics and the electrics
1
.
2. Move the lever forwards to the notched oating position and move the tractor forwards
2
. If necessary,
turn the wheels.
3. Gently activate lifting
3
. The loader is locked (indicator shows green).
4. Raise and lock the right and left parking stands.
5. Essential check: lower the implement to the ground with force.
2
+
3
1