EasyManua.ls Logo

NACD 11.5 - User Manual

NACD 11.5
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
NACD Power Take-Off Service Manual
1016070AM
11.5" TP Power Take Off
Includes Installation, Operation, Maintenance and Overhaul Instructions
Question and Answer IconNeed help?

Do you have a question about the NACD 11.5 and is the answer not in the manual?

Summary

NOTICE IMPORTANT INFORMATION

General Operational Practices

General guidelines for safe working and operating practices with NACD products.

Safety Notice and Product Use

Alerts users to potential dangers from product use and emphasizes adherence to safe procedures.

Owner, Operator, and User Responsibilities

Outlines the responsibility of users for following specified procedures for safe and reliable use.

Warranty Information Reference

Directs users to this publication for detailed information on NACD's limited warranty.

INTRODUCTION

General Product Information

Provides necessary information for operation and maintenance of the specified NACD Power Take Off.

Spare and Replacement Parts

Details on ordering spare and replacement parts, including parts lists and bill of materials.

Parts Shipment Procedures

Information on shipping procedures, FOB terms, and responsibilities for shipping charges.

Preventative Maintenance and Troubleshooting

Guidance on referencing manual information for trouble-free operation and maintenance schedules.

Lifting Bolt Holes and Safe Handling

Instructions on using lifting points and avoiding misuse to prevent damage or injury.

SAFETY

General Safety Practices

Emphasizes safe practices for personnel operating and servicing NACD units, disclaiming liability for injury.

Critical Safety Notice

Highlights dangers from product use and the need for correct procedures, guards, and safety codes.

Sources for Service Information

Details on obtaining service bulletins, manuals, and contact information for NACD.

DESCRIPTIONS & SPECIFICATIONS

General Product Description

Overview of the NACD 11.5" TP Power Take-Off, its components, and lubrication.

Warranty Information

Directs users to the warranty statement at the end of the manual for detailed warranty information.

INSTALLATION

Preliminary Inspection Checks

Procedures for measuring and checking engine/motor shaft end play and run out before installation.

Drive Ring Installation Procedure

Steps for cleaning and mounting the drive ring onto the flywheel, including torque specifications.

Pilot Bearing Installation

Instructions for installing greasable and non-greasable pilot bearings, including sealing and lubrication.

Power Take-Off to Engine Mounting

Steps for installing the PTO onto the engine driving member, aligning shafts, and checking preload.

Installation Best Practices

Tips to avoid misalignment, excessive loads, and ensure proper lubrication and clutch adjustment.

Fastener Torque Specifications

Tables providing torque values for U.S. Standard and Metric fasteners during assembly.

Allowable Side Load Calculations

Data and formula for determining allowable side load pulls based on shaft speed and distance.

PREVENTATIVE MAINTENANCE

Lubrication Procedures and Intervals

Guidelines for lubricating operating shaft fittings, throwout collar, main bearings, and pilot bearings.

Clutch Adjustment Instructions

Steps for adjusting the clutch, including initial checks and torque requirements for engagement.

DISASSEMBLY

Power Take-Off Unit Disassembly

Steps to remove external parts, hand lever, and the PTO housing from the engine flywheel.

Clutch Assembly Disassembly

Procedures for disassembling the clutch, including removing nuts, pullers, and internal components.

Clutch Shaft and Housing Disassembly

Steps for removing nameplates, grease fittings, bearing retainers, and bearings from the shaft and housing.

Ball Bearing Collar Disassembly

Instructions for removing snap rings, pressing sleeves, and separating bearing collars.

ASSEMBLY

Clutch Shaft and Housing Assembly

Steps for cleaning and installing bearing cones, cups, and retainers onto the clutch shaft and carrier.

Clutch Assembly Steps

Procedures for assembling clutch plates, center plates, floating plates, and the collar assembly.

Power Take-Off Unit Assembly

Final assembly steps for the PTO unit, including shaft, yoke, keys, and housing components.

NACD 11.5 Specifications

General IconGeneral
BrandNACD
Model11.5
CategoryTools
LanguageEnglish