Do you have a question about the NAPCO StarLink SLE-LTEVI Series and is the answer not in the manual?
Brand | NAPCO |
---|---|
Model | StarLink SLE-LTEVI Series |
Category | Cell Phone |
Language | English |
Lists Commercial/Residential LTEVI/LTEAI series models with or without power supply.
Lists optional accessories like power supply, Wi-Fi module, and antennas.
Specifies electrical ratings for 120VAC and input voltage.
Lists relevant UL and other agency compliance standards.
Details the function of each terminal from TB1 to TB13.
RJ-45 sockets for FACP DACT connection.
Connection for broadband modem, router, or switch.
Normally open dry contact for Form C relay output.
Describes Green RF Signal, Yellow Status, Red Trouble, Red Diagnostic, and Green IP LEDs.
Lists settings for remote downloading, unsupervised inputs, supervision, and Wi-Fi.
Details jumper settings on the PC board.
How the StarLink radio functions as a primary wireless IP communicator.
Process for creating an account and registering the StarLink radio.
Guidance on selecting location, verifying signal strength, and safety.
Details wiring for primary mode communication, including TELCO ports.
Instructions for applying power to the unit.
Verify signals online via www.NapcoNOC.com.
Use PCD-Windows Quickloader for programming reporting formats.
Wiring for trouble activation using EOLR in series or parallel.
Wiring instructions for models without SLE-ULPS-R power supply.
Supervision of Telco wires and detecting cuts.
Technician requirements for commercial and residential updates.
Optional front and rear tamper switches for metal housings.
Connect StarLink to panel for Telco Trouble and line cut detection.
Licensed electrician required for 120VAC wiring.
Configuration and wiring of OUT1 relay for trouble reporting.
Connect FACP Aux Power or listed power supply to terminals 1 & 2.
Tip/Ring Wiring Fault Report feature required for supervision.
Instructions for using JP2 option with power supply wire.
Optional wiring to RJ31X for longer distances or direct to panel.
Instructions for using JP2 option with power supply wire.
Connect IN2 to panel output for identifying Telco line cut.
Remove JP2 to enable TELCO2 trouble reporting.
Shunt JP1 on top 2 pins when using SLE-ULPS-R.
Method for using existing FACP telco connections for supervision.
Instructions for wiring tamper switches.
Locations for mounting tamper switches in the cabinet.
Wire tamper loop as a normally closed sensor to a control panel zone.
Example of conduit location for wiring.
UL listed method for branch circuit power connections.
Limit transformer secondary wiring conduit to 20 feet.
Proper wiring methods for single-conductor terminal blocks.
Proper wiring methods for barrier type terminal blocks.
Pigtail wiring method for multiple or different sized conductors.