InstallationInstallation
Unboxing & InspectionUnboxing & Inspection
Please study this manual Please study this manual
before installation.before installation.
Please inspect the package before unboxing, if any destroy with appearance, contactPlease inspect the package before unboxing, if any destroy with appearance, contact
with the supplier as soon with the supplier as soon
This device shall be installed and operated by professionals.This device shall be installed and operated by professionals.
Preparation for InstallationPreparation for Installation
Batteries shall not be placed in direct sunshine or Batteries shall not be placed in direct sunshine or
close to heat source.close to heat source.
Batteries shall be installed in place with good ventilation to assure enough heatBatteries shall be installed in place with good ventilation to assure enough heat
Batteries shall be placed in are with clean ambient and Batteries shall be placed in are with clean ambient and
Heavy weight shall not be placed on any cable.Heavy weight shall not be placed on any cable.
Installation of Battery ModulesInstallation of Battery Modules
1) Installation and fixation1) Installation and fixation
Battery modules of NPFC series are applicable to installation in 19inches cabinets andBattery modules of NPFC series are applicable to installation in 19inches cabinets and
wall-hanging.wall-hanging.
19inch cabinet installation19inch cabinet installation
Insert battery module into 19 inch cabinet, and fix two handles of batteryInsert battery module into 19 inch cabinet, and fix two handles of battery
module with cabinet rack using 4pcs M5 screws.module with cabinet rack using 4pcs M5 screws.
hanging installation also can be adopted, fix two handles of batterhanging installation also can be adopted, fix two handles of batter
module with triangle rack on the wall using 4pcs M5 screws.module with triangle rack on the wall using 4pcs M5 screws.
2) Ground connection2) Ground connection
GND screw in front panel of battery is connected with ground through aGND screw in front panel of battery is connected with ground through a
flexible cable flexible cable
3) Battery output connection3) Battery output connection
Connect ‘+’ ofConnect ‘+’ of
with positive female copper bar of power plant, and ‘with positive female copper bar of power plant, and ‘
with negative breaker or fuse.with negative breaker or fuse.
If multi battery modules will be connected in parallel, connect ‘+’ ofIf multi battery modules will be connected in parallel, connect ‘+’ of
Battery OutputBattery Output
each battery moduleeach battery module
with positive female copper bar of power plant, and ‘with positive female copper bar of power plant, and ‘
negative breaker or fuse.negative breaker or fuse.