89Installation Checklist
PCB DIP SW 2 setting (Set of 8) Ye s N o
Is switch #1 set correctly for the gas type used? (NG-OFF, LP-ON)
If continuous boiler operation is required, is switch #7 in the up (ON) position?
If high temperature venting has been installed (CPVC or polypropylene), is switch #8 in the up (ON) position?
Operating the boiler Ye s N o
Have you given the Installation & Operation Manual and User’s Information Manual to the owner for future reference?
Have you shown the owner how to shut off the gas in case of an emergency?