EasyManuals Logo

NCR VOYIX CX5 Kit Instructions

NCR VOYIX CX5
11 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
Confidential and proprietary information of NCRVoyix Corporation.
Unauthorized use, reproduction and/or distribution is strictly prohibited.
6
Installation Procedure
Warning
Disconnect the AC power cord from the AC outlet and wait 30 seconds before
servicing the terminal.
1. Lay the Display face down on a flat surface.
Note
Always use a soft material (cloth, foam) to protect the display screen when
placing the terminal face down.
2. Remove the Cable Cover.
a. Remove the two (2) screws that secure the Cable Cover to the Back Cover.
b. Rotate and unhook the Cable Cover from the Back Cover.

Other manuals for NCR VOYIX CX5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NCR VOYIX CX5 and is the answer not in the manual?

NCR VOYIX CX5 Specifications

General IconGeneral
BrandNCR
ModelVOYIX CX5
CategoryRacks & Stands
LanguageEnglish

Related product manuals