EasyManua.ls Logo

NCR XL15W - Page 27

NCR XL15W
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation 2-19
d. Route the cables through the neck slot then push cables through the curved neck
opening and then out the base opening. Align the Audio Cable and Display Port
Cable to the left side and the 12V USB Cable to the right side.
e. Pull cables such that most of the cables have been fed through the base opening.
6. Position the display and stand assembly in an upright position.

Related product manuals