6. TEMPRA BATTERIES
PARALLEL
You can connect up to 4 TEMPRA Lithium Batteries in
parallel, series connection is not allowed.
Follow the instructions for correct installation:
1. Select Master mode on one of the batteries and set
the other Tempra to Slave. Act on Dip Switch No. 4
(Chapter 10).
2. Make the electrical connection in parallel.
3. Create the N-BUS network - connect the data cable
forming a chain from one battery to the next
(connect any other NDS N-BUS devices present).
9
NOTE
The connection cable between several N-BUS devices is a 6-
pole (straight through) cable with RJ11 6C/6P connectors at
both ends. It is possible to buy a pre-assembled NDS cable
available in different models and lengths BC 03M (3m), BC
06M (6m) and BC 10M (10m).
The N-BUS cable for DTB01 display is a proprietary NDS cable,
and it is different from BC 03M, BC 06M and BC 10M.
N-BUS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NDS TEMPRA TBL 100 and is the answer not in the manual?

NDS TEMPRA TBL 100 Specifications

General IconGeneral
BrandNDS
ModelTEMPRA TBL 100
CategoryCamera Accessories
LanguageEnglish

Related product manuals