EasyManua.ls Logo

NEC SV8100 - Page 2

NEC SV8100
3 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. On the top chassis, press the power switch to the off position
2. On the bottom chassis, press the power switch to the off position
3. The system will power down, leave the system powered off if required (Due to electrical
work being carried out)
4. Alternatively, count to 10 and then press the power switch to the on position on the top
chassis
5. Press the power switch to the on position on the bottom chassis
6. The system should be up and operational within 5 minutes.
Reboot/Power Down for 3 Chassis System
In the event of a reboot or complete power down, if you have 3 chassis’, please follow the
instructions below.
1. On the top chassis, press the power switch to the off position
2. On the middle chassis, press the power switch to the off position
3. On the bottom chassis, press the power switch to the off position
4. The system will power down, leave the system powered off if required (Due to electrical
work being carried out)
5. Alternatively, count to 10 and then press the power switch to the on position on the top
chassis
6. Press the power switch to the on position on the middle chassis
7. Press the power switch to the on position on the bottom chassis
8. The system should be up and operational within 5 minutes.
Reboot/Power Down for 3 Chassis System
In the event of a reboot or complete power down, if you have 4 chassis’, please follow the
instructions below.
1. On the top chassis, press the power switch to the off position
2. On the middle chassis, press the power switch to the off position
3. On the next chassis, press the power switch to the off position
4. On the bottom chassis, press the power switch to the off position
5. The system will power down, leave the system powered off if required (Due to electrical
work being carried out)
6. Alternatively, count to 10 and then press the power switch to the on position on the top
chassis
7. Press the power switch to the on position on the middle chassis
8. On the next chassis, press the power switch to the off position
9. Press the power switch to the on position on the bottom chassis

Other manuals for NEC SV8100

Related product manuals