EasyManua.ls Logo

Neopost DS-90 User Manual

Neopost DS-90
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Table of Contents
1 Unpacking Instructions ...............................................................................1
2 Before you Start ...........................................................................................6
3 Installation ....................................................................................................7
Installing the Feeder Module............................................................................7
Installing the Document Feed Trays.................................................................7
Installing the HCDF..........................................................................................8
Installing the MaxiFeeder.................................................................................8
High Capacity Envelope Hopper (EF-4).........................................................10
Installing the High Capacity Conveyor Belt....................................................12
4 Filling the Sealing Liquid Reservoir .........................................................13
Filling the Sealing Liquid Reservoir................................................................13
5 Connect the System to Mains Power Supply and Power Up ..................14
Power Up........................................................................................................14
Set Sales Organisation and Countr y Specific Details....................................14
6 Setting Online Services (option) ...............................................................15
Configuring Online Ser vices..........................................................................15
Connecting the First Time..............................................................................16
7 Test the System and Define Custom Jobs ...............................................17
Testing the System.........................................................................................17
Defining Customized Jobs .............................................................................18
| Page 1 | TOC | dec-27-2011 15:24 |
Question and Answer IconNeed help?

Do you have a question about the Neopost DS-90 and is the answer not in the manual?

Neopost DS-90 Specifications

General IconGeneral
BrandNeopost
ModelDS-90
CategoryAll in One Printer
LanguageEnglish

Summary

Unpacking Instructions

Before You Start

Installation

Installing the Feeder Module

Connects the feeder module to the inserter, involving physical attachment and cable connection.

Installing Document Feed Trays

Positions and secures document feed trays onto the inserter, requiring specific alignment and hooking.

Installing the HCDF

Installs the HCDF feeder tray by manipulating levers, hooking the tray, and releasing the lever.

Installing the MaxiFeeder

Attaches the MaxiFeeder to designated positions and connects it for system recognition and auto-detection.

High Capacity Envelope Hopper Installation

Sets up a high capacity envelope hopper for bulk feeding, including initial switch-on and alignment.

Installing High Capacity Conveyor Belt

Connects and positions the high capacity conveyor belt, including adapter and power connections.

Filling the Sealing Liquid Reservoir

Filling the Sealing Liquid Reservoir

Open front cover, fill reservoir to 'Max' lip with sealing liquid, and close cover.

System Power and Setup

Power Up Procedure

Connect system to mains power, switch on, and select language. Avoid incorrect power supply.

Configure Localization Settings

Set localization options like language and document standard in the service menu.

Online Services Configuration

Configuring Online Services

Access Supervisor menu, enter prefix, and configure date/time for online services connection.

Initial Server Connection

Perform initial declaration call to central server, monitoring status via the [i] button.

System Testing and Job Customization

Testing the System

Load components, start a job, adjust positions, and verify fold and flap closer quality.

Defining Custom Jobs

Create and define new jobs based on specific customer requirements and applications.