EasyManua.ls Logo

Neslab HX-150 User Manual

Default Icon
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation, Operation,Installation, Operation,
Installation, Operation,Installation, Operation,
Installation, Operation,
and Maintenance Manand Maintenance Man
and Maintenance Manand Maintenance Man
and Maintenance Man
ualual
ualual
ual
HX AnalogHX Analog
HX AnalogHX Analog
HX Analog
RecirRecir
RecirRecir
Recir
culating Chillerculating Chiller
culating Chillerculating Chiller
culating Chiller
NESLAB Manual P/N 002023
Rev. 02/25/92
Question and Answer IconNeed help?

Do you have a question about the Neslab HX-150 and is the answer not in the manual?

Neslab HX-150 Specifications

General IconGeneral
BrandNeslab
ModelHX-150
CategoryChiller
LanguageEnglish

Summary

Preface and Support Information

Unpacking Instructions

Retain all cartons and packing material until the unit is operated and found to be in good condition.

Warranty Details

All NESLAB units are shipped with a warranty card. The top portion of the card remains with the unit.

After-sale Support Contact

NESLAB is committed to customer service both during and after the sale. Contact Sales Department for operation questions.

Section I Safety

General Safety Warnings

Make sure you read and understand all instructions and safety precautions listed in this manual before installing or operating your unit.

Section II General Information

Unit Description

The HX Series Recirculating Chiller is designed to provide a continuous flow of cooling fluid at a constant temperature and volume.

Specifications

Cooling Capacity

Pump Capacity

Section III Installation

Site Selection (Air-cooled Units)

The unit should be located in a laboratory or clean industrial environment where ambient temperatures are inside the range of +55°F to +95°F.

Site Selection (Water-cooled units)

The unit should be located in a laboratory or clean industrial environment with easy access to a facility cooling water supply and a drain.

Electrical Requirements

Plumbing Requirements

Connecting the HX Unit

Before installing the unit to an instrument that previously used tap water as a cooling fluid, flush the instrument.

Fluids

Filling Requirements

Pump Purging

Section IV Operation

Start Up Procedure

Before starting, check all electrical and plumbing connections and make sure the recirculating system has been properly filled with cooling fluid.

Refrigeration Control

Turn the calibrated dial until the desired temperature aligns with the reference line.

Flow Control

The flow control handle is connected to a valve that controls the flow rate of the cooling fluid to the instrument being cooled.

Pressure Gauge Operation

Units with a PD-1, PD-2, or any TU type pump are equipped with a pressure gauge.

Pressure Relief Valve

High Pressure Cutout

Section V Special Features

Pump Motor Overload Protector

Three phase units with three phase pump motors are equipped with a pump motor overload protector.

Optional Heater Package

External Pressure Regulator (Optional)

Automatic Refill Device (Optional)

Section VI Maintenance

Service Contracts

NESLAB offers on-site Service Contracts that are designed to provide extended life and minimal down-time for your unit.

Condenser Cleaning

A build up of dust or debris on the fins of the condenser will lead to a loss of cooling capacity.

Algae Prevention

To restrict the growth of algae in the fluid reservoir, it is recommended that the reservoir cover be kept in place and that all recirculation lines be opaque.

Section VII Service

Pump Strainer Maintenance

If debris is drawn into the recirculating system, the strainer will prevent the material from being sucked into the pump.

Phase Rotation

Pump Lubrication

Section VIII Troubleshooting

Troubleshooting Checklist

Unit will not start: Check power source for correct voltage output. Check house circuit breaker.

Service Assistance

If, after following these troubleshooting steps, your unit fails to operate properly, contact our Service Department.

Section IX Diagrams

Refrigeration Flow Diagram (HX-75 to HX-150)

Diagram showing the path of refrigerant through the system for HX-75 to HX-150 models.

Refrigeration Flow Diagram (HX-200 to HX-750)

Diagram showing the path of refrigerant through the system for HX-200 to HX-750 models.

Pump Flow Diagram (CP Pumps)

Diagram illustrating the fluid flow for units equipped with CP pumps.

Pump Flow Diagram (PD and TU Pumps)

Diagram illustrating the fluid flow for units equipped with PD and TU pumps.

Section X Warranty

Related product manuals