EasyManua.ls Logo

NetApp AFF A400 - Page 59

NetApp AFF A400
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. If the replacement node is not at the LOADER prompt, halt the system to the LOADER prompt.
2.
On the healthy node, check the system time:
show date
The date and time are given in GMT.
3.
At the LOADER prompt, check the date and time on the replacement node:
show date
The date and time are given in GMT.
4.
If necessary, set the date in GMT on the replacement node:
set date mm/dd/yyyy
5.
If necessary, set the time in GMT on the replacement node:
set time hh:mm:ss
6.
At the LOADER prompt, confirm the date and time on the replacement node:
show date
The date and time are given in GMT.
Step 2: Verify and set the HA state of the controller module
You must verify the
HA state of the controller module and, if necessary, update the state
to match your system configuration.
1.
In Maintenance mode from the new controller module, verify that all components display the same
HA
state: ha-config show
The HA state should be the same for all components.
2.
If the displayed system state of the controller module does not match your system configuration, set the
HA
state for the controller module: ha-config modify controller ha-state
The value for HA-state can be one of the following:
ha
mcc
mcc-2n
mccip
non-ha
3.
If the displayed system state of the controller module does not match your system configuration, set the
HA
state for the controller module: ha-config modify controller ha-state
4.
Confirm that the setting has changed:
ha-config show
Step 3: Run diagnostics
After you have replaced a component in your system, you should run diagnostic tests on
that component.
Your system must be at the LOADER prompt to start diagnostics.
All commands in the diagnostic procedures are issued from the node where the component is being replaced.
57

Other manuals for NetApp AFF A400

Related product manuals