EasyManua.ls Logo

NetApp E Series - Page 108

NetApp E Series
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(1) Controller canister
(2) Cam handle
5. Using two hands and the cam handle, slide the controller canister out of the shelf.
Always use two hands to support the weight of a controller canister.
If you are removing the controller canister from an E5724 controller shelf, a flap swings into place to block
the empty bay, helping to maintain air flow and cooling.
6. Turn the controller canister over, so that the removable cover faces up.
7. Place the controller canister on a flat, static-free surface.
Step 3: Install a HIC
Install a new HIC to replace the failed one.
Possible loss of data accessNever install a HIC in an E5700 controller canister if that HIC
was designed for another E-Series controller. In addition, if you have a duplex configuration,
both controllers and both HICs must be identical. The presence of incompatible or mismatched
HICs causes the controllers to lock down when you apply power.
Steps
1. Unpack the new HIC and the new HIC faceplate.
2. Press the button on the cover of the controller canister, and slide the cover off.
106

Other manuals for NetApp E Series

Related product manuals