EasyManua.ls Logo

NetApp E Series - Page 26

NetApp E Series
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(1) Battery release latch
(2) Battery
6. Turn the controller canister over to confirm that the battery is installed correctly.
Possible hardware damageThe metal flange at the front of the battery must be
completely inserted into the slot on the controller canister (as shown in the first figure). If the
battery is not installed correctly (as shown in the second figure), the metal flange might
contact the controller board, causing damage to the controller when you apply power.
CorrectThe battery’s metal flange is completely inserted in the slot on the controller:
IncorrectThe battery’s metal flange is not inserted into the slot on the controller:
24

Other manuals for NetApp E Series

Related product manuals