EasyManua.ls Logo

NetApp E Series - Page 29

NetApp E Series
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 7: Install new controller canister (duplex)
After installing the battery and the host interface card (HIC), if one was initially installed, you can install the new
controller canister into the controller shelf.
Steps
1. Reinstall the cover on the controller canister by sliding the cover from back to front until the button clicks.
2. Turn the controller canister over, so that the removable cover faces down.
3. With the cam handle in the open position, slide the controller canister all the way into the controller shelf.
27

Other manuals for NetApp E Series

Related product manuals