a. Cable controller A to IOM A.
b. Cable controller B to IOM B.
2. Power the drive shelves.
You need the following cables:
Power cables
Confirm the drive shelf power switches are off.
a. Connect the two power cables for each shelf to different power distribution units (PDUs) in the cabinet
or rack.
b. If you have drive shelves, turn on their two power switches first. Wait 2 minutes before applying power
to the controller shelf.
c. Turn on the two power switches on the controller shelf.
d. Check the LEDs and seven-segment display on each controller.
During boot, the seven-segment display shows the repeating sequence of OS, Sd, blank to indicate the
controller is performing start-of-day processing. After the controller has booted up, the shelf ID is
displayed.
8

Other manuals for NetApp E2824

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NetApp E2824 and is the answer not in the manual?

NetApp E2824 Specifications

General IconGeneral
ModelE2824
CategoryStorage
Form Factor2U
Drive Bays24
Maximum Raw Capacity1.8PB
Host Interface12 Gb/s SAS
RAID SupportYes
Hot-Swap DrivesYes
RAID Levels0, 1, 5, 6, 10
Power SupplyDual redundant
Drive TypeSAS, SSD
Host Connectivity12Gb/s SAS
ControllerDual active controllers

Related product manuals