64
5.5 Schedules
Schedules can specify when should an output be switched on or when is an action valid. To manage
schedules, select Schedules in the left menu.
By default, NETIO PowerBOX contains one schedule: Always. To create a new schedule, click Create
schedule. Specify the schedule name and set the intervals when the output should be switched on.
Note
For an output to be controlled according to the schedule, the schedule needs to be selected
for that particular output at the Schedule tab in the output configuration.
Figure 30 ā Adding a custom schedule
A new interval can be quickly created by marking the corresponding slots by clicking and dragging
with the left mouse button. An existing interval can be shortened or extended by dragging either end
of the interval. To delete an interval, click it with the right mouse button. To create an interval
encompassing an entire day, click the box next to that day in the All day column. By clicking and
dragging, intervals (including all-day ones) can be created for several days at the same time.
In this quick way, intervals can be created with a granularity of 10 minutes. To specify the times for
an existing interval more precisely, click it with the left mouse button to open the start and end time
settings. There it is possible to specify the time up to the second. To save the new values, click OK.
To create a new interval by entering the precise times, click an empty space within the respective
day with the left mouse button.