6-WORKINGOPERATIONS
Backhoebucket–Install
1.Starttheengine.
2.Extendthebucketcylinderrodtobringtheconnecting
rodtotheirhousing.
3.Reinstallthearm/bucketlinkpin(2),theninstallthe
lockringsandpins.
4.Slightlyraisetheattachment,thenoperatethebucket
anddippercontroltoalignthedipperholewiththe
bucketlugs.
5.Reinstalltherod/bucketlinkpin(1),theninstallthelock
ringsandpins.
LEEN12T0675AA1
6-48