Overhaul
The ventilator should be overhauled every
3
years or after 15000 hours
of operation or more often if required. The overhaul
s.hould be
performed by a
Newport Medical service technician at the factory
service center.
Iri addition to the items performed during Preventive
Maintenance, an overhaul will include the overhaul of the
Air/02 mixer
and replacement of moving parts if required. Contact NMI customer
service for further information on the above service.
3.3
OPERATIONAL VERFCATlON
AND
CALIBRATION PROCEDURES
This procedure is included to assist the Qualified Operator or Hospital
Service Technician in establishing a routine verification procedure to
verify that the
BREEZE
ventilator is in operating condition. The
procedure is explained and is intended to help test the unit after
repair/replacement of parts on the unit.
CAUTION: Before using any test equipment for calibration, verify
that the accuracy of the instrument is certified by a
testing laboratory whose master test instruments are
traceable to The National
Institute of Standards and
Technology or equivalent.
Preliminary Adjustments:
The Preliminary adjustments are done at the factory and need not
be
adjusted unless the parts that directly affect them are replaced.
Connect Air and
O2
sources to their respective inlets at the rear of the unit.
1.
Input Voltage:
Adjust the power input on the power entry module
on the back of the unit to desired input voltage.
For
U.S.A.:
120 vac., 1A