General
Pipe installation must be carried out in accordance with
current norms and directives.
Only use refrigerant pipes that are seamless, degreased,
deoxidized and suitable for a pressure of at least 42
bar. The pipes must be supplied with at least 8 mm
vapour-proof insulation.
Max 10 m
Max 10 m
Max 10 m
Max 10 m
Pipe length
1.5 mThe refrigerant pipes' minimum length
7.5 mThe refrigerant pipes' total length with
standard filling
15 mThe refrigerant pipes' total length with
additional filling
1
1
1. Additional filling of refrigerant can be done when the unit runs in cooling
operation:
For refrigerant pipe 1/4" - 3/8" = 15 g/m
For refrigerant pipe 1/4" - 1/2" = 20 g/m
For information about pipe dimensions, see section
"Technical Specifications" on page 16.
Condensation drain
For condensation removal, the AG-CH10 accessory of
suffient length is required to transport the condensa-
tion to an external drain. See section "Accessories" on
page 14 for further information about AG-CH10.
Connecting the cooling circuit
Use the flare method to connect the pipes.
Lubricate the contact surfaces and hand tighten, then
tighten the connections using a torque wrench to
obtain a good and secure connection, see installation
instructions on page 8.
Check carefully that there is no risk of any leakage
prior to the function test.