Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
DateSignatureNotesDescription
āœ”
Heat pump (page 12)
Shut off valves
Venting valve
Shut off valve
Hot water (page 12)
Shut off valves
Mixing valve
Expansion vessel
T&P valve
Tundish
Cold water (page 12)
Shut off valves
Non-return valve
Safety valve
Tundish
Electricity (page 18)
Connected supply
Sensors
Temperature limiter
Miscellaneous
Benchmark checklist