Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be
carried out by a suitably qualified person.
DateSignatureNotesDescription
Heat pump (page 13)
Shut off valves
Venting valve
Shut off valve
Hot water (page 14)
Shut off valves
Expansion vessel
T&P valve
Tundish
Cold water (page 14)
Shut off valves
Non-return valve
Mixing valve
Safety valve
Tundish
Electricity (page 16)
Hot water sensor
Temperature limiter
Miscellaneous
Benchmark checklist