EasyManua.ls Logo

NICEDAY CT11 - Assembly Instructions: Locking and Caps; Step 3: Locking the Vertical Tube; Step 4: Attaching Decorative Cap

NICEDAY CT11
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP3: Locking the vertical tube via the M8*78 Bolt(16) and the M8*20 Screws(17).
Note: Please tighten all bolts and screws of this position thoroughly. The screw's insufficient
tightening will cause squeaking noise during use.
17
6
#
16
+ + + ==L
STEP4: Fix the decorative cap (preassembled)to the mainframe. Insert the Sealing Ring (15)
into the decorative cap.
decorative cap
-4-