6) Using base controls, cycle machine over complete envelope in accordance with the Operating
Instructions. Cure any defects.
7) Ensure that all safety devices and controls operate in accordance with the instructions.
8) If necessary, perform a load test to establish the machine stability before putting the machine to
work.
9) On completion of an extended period of road transport, the machine might need additional
inspection to identify any transit degradation, which could render the machine unsafe. Perform
a P.D.I. inspection on the unit before it enters service. Record any faults found and rectify them
immediately.
Niftylift Limited is not liable for any third party damage caused during transport. Careful attention to
correct procedures will prevent many of the small snags that can happen in transit. Re-work is both
expensive and time consuming. A defective machine arriving at the place of work is a poor
advertisement for our product, the company’s reputation and those of our dealers and clients. The
responsibility for safe and damage-free transport rests with the haulier or his representatives