EasyManua.ls Logo

Norac UC5 - Page 45

Norac UC5
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
5.4. BoomFunctionTest
1. Navigate to the Boom Movements screen in the diagnostic menu (Run Screen> Settings> Next>
Diagnostics>BoomMovements).
2. PressandholdtheLeftUpboomfunctiononthedisplay.
3. EnsuretheLeftUpboomfunctionoperates.
4. Repeatsteps1
to3foralltheotherboomfunctions:LeftDown,RightUp,RightDown,MainUp,Main
Down,RollClockwiseandRollCounterClockwise.
BoomFunctionTestResults
5.4.1.1. Proportionalfunctiondoesnotmove,orwrongonemoves
Ensurethebypass(jam)valveisbeingactivated.Trypressinganunfoldfunctionatthe
sametimetoseeiftheboomfunctionmoves.
Testthevalvemoduledrivers.Thisteststheelectrical
portion.
Ensuretheoutputsarecorrectlyconfigured.
Performamanualvalveoverridetest.Thisteststhehydraulicportion.
Ensurethehydraulicsareengaged.
Check the hydraulics installation. The raise lines must be connected to the “B” ports
andthelowerlinesmustbeconnectedtothe“A”ports.
5.4.1.2. On/Offfunctiondoesnotmove,orwrongonemoves
Ensuretheoutputsarecorrectlyconfigured.
Testtheinputmoduledrivers.Thisteststheelectricalportion.

Other manuals for Norac UC5

Related product manuals