17
Ensure that the furniture paneling is able to handle the forces created by the
connection.
Do not screw into the refrigerator cabinet.
The refrigerators are prepared for flush build in.
9. Ventilation
The refrigerator performance depends on good ventilation. Ventilation for N2090 and N2152 takes
place through the front vent openings in the refrigerator. Ambient air enters through the bottom
at the front and is forced through the cooling system. Heated air is pushed away via the top vent
opening.
Ventilation for the N2160 and N2175 takes place through the integrated and insulated cooling unit
box at the bottom part of the refrigerator.
Ensure that the top and bottom vent openings are not obstructed and are able to vent
freely.
The bottom vent opening has no filter. For all models, placing a filter is not needed and
might lead to poor performance.
N2160/N2175

Other manuals for Norcold N2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Norcold N2000 Series and is the answer not in the manual?

Norcold N2000 Series Specifications

General IconGeneral
BrandNorcold
ModelN2000 Series
CategoryRefrigerator
LanguageEnglish

Related product manuals