9
10. Insert the Pivot Axle (74) into the Upright (3) and cen-
ter it. Apply a generous amount of the included
grease to the Pivot Axle.
Orient the Left Upper Body Arm (11) as shown, and
slide it onto the left end of the Pivot Axle (74). Slide
the Right Upper Body Arm (12) onto the right end of
the Pivot Axle.
Tighten an M8 x 23mm Button Screw (84) with an
M8 Washer (88) and a Wave Washer (111) into each
end of the Pivot Axle (74). Make sure that the Wave
Washers are on the ends of the Pivot Axle.
88
84
111
88
74
3
84
111
12
11
Grease
10
9. Identify the Left Handlebar (8) and the Left Upper
Body Arm (11), which are marked with stickers.
Orient the Left Handlebar (8) and the Left Upper
Body Arm (11) as shown. Insert the Left Handlebar
into the Left Upper Body Arm. Attach the Left
Handlebar with two M8 x 43mm Button Bolts (78)
and two M8 Jam Nuts (79). Make sure that the
Jam Nuts are in the hexagonal holes in the Left
Upper Body Arm.
Attach the Right Handlebar (9) to the Right Upper
Body Arm (12) in the same way.
9
11
8
9
12
78
78
79
79