INSTALLATION CHECKLIST
INSTALLATION ADDRESS:
CITY: STATE:
UNIT MODEL #
UNIT SERIAL #
INSTALLER NAME:
CITY STATE
Unit Installed Minimum clearances
shown on page 3?
YES NO
Has the owner’s information been
reviewed with the customer?
YES NO
Has the Literature Package been
left with the unit?
YES NO
REFRIGERATION SYSTEM
Was unit given 24 hr warm up
period for crankcase heaters?
YES NO
Stage-1 Liquid Pressure (high side):
Stage-1 Suction Pressure (low side):
REPLACEMENT PARTS
Replacement parts are available through your distributor.
Please have the complete model and serial number of the
unit when ordering replacement parts.
ELECTRICAL:
• Capacitors • Temperature Limit Switches
• Compressors • Thermostats
• Contactors • Time Delay Relays
• Pressure Switches • Transformers
• Relays
MOTORS:
• Blower Motor
• Fan Motor
COMPONENTS:
• Blower Assembly • Fan Grille
• Cabinet Panels • Filter/Driers
• Expansion Valves
Specifications & illustrations subject to change without notice or incurring obligations (03/23).
O’Fallon, MO, © Nortek Global HVAC LLC 2023. All Rights Reserved.
1044362A
(replaces 10443620)
ELECTRICAL SYSTEM
Electrical connections tight? YES NO
Line voltage polarity correct? YES NO
Rated Voltage:
Maximum deviation of voltage from average volts:
Has the thermostat been calibrated? YES NO
Is the thermostat level? YES NO
Is the heat anticipator setting
correct? (If Applicable)
YES NO