EasyManua.ls Logo

Nortek GUD24AH2/A-D(U) - Piping Work

Nortek GUD24AH2/A-D(U)
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Air Handlers
13
A B
4.3 Piping Work
4.3.1 Specification of Connection Pipe
Model
External diameter (inch)
Gas pipe
Liquid pipe
GUD24AH2/A-D(U)
GUD36AH2/A-D(U)
GUD48AH2/A-D(U)
GUD60AH2/A-D(U)
Φ3/4 Φ3/8
4.3.2 Piping Preparation
4.3.2.1 Solder Connection
All cut ends are to be round, burr free, and cleaned. Failure to follow this practice
increases the chances for refrigerant leakage.

Related product manuals