EasyManua.ls Logo

NPK PH1 - Page 22

NPK PH1
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 21 -
LUBRICATION
AUTO LUBE GREASE LINE PRE-FILLING
8. Pump grease through the grease line
(29) until a steady stream of grease
(28) is realized at the opposite
(hammer) end.
9. Re-attach the grease line (29) to the
hammer (KK).
10. Pump twenty more shots of grease
into the grease line (29). This will
prime the hammer cavity and pre-lube
the tool. Look for grease coming out
around the tool (HH) at the tool
bushing (see arrow).
11. Remove the hose fill adapter (a13)
and re-connect the grease line (29) to
the Auto Lube pump (FZ).
NOTE: If the Auto Lube has run out of grease, the above procedure should be
used to purge all the air out of the line (29) before using the hammer.
Failure to do this will result in an intermittent supply of grease to the
hammer.

Table of Contents

Other manuals for NPK PH1

Related product manuals