EasyManua.ls Logo

NPK PH1 - Before Starting the Hammer; Daily Start-Up Procedure

NPK PH1
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 29 -
START-UP OPERATION
BEFORE STARTING THE HAMMER
PRE-OPERATION INSPECTION AND WARM UP
Before operating the NPK HYDRAULIC HAMMER, be sure to perform the specified
inspection, see “ROUTINE INSPECTION AND MAINTENANCE”.
Warm up the NPK HYDRAULIC HAMMER, see below, and the base machine in
accordance with the machine manufacturer’s instruction manual. This is especially
important during cold weather operation.
DAILY START-UP PROCEDURE
Operate the NPK HYDRAULIC HAMMER in the vertical position, at 3/4 engine throttle
setting, for about 1-2 minutes. During this period, inspect the NPK HYDRAULIC
HAMMER and INSTALLATION KIT for leaks or loose connections.
Do not operate on a
slanted surface during
the start-up operation.

Table of Contents

Other manuals for NPK PH1

Related product manuals