EasyManua.ls Logo

NTI FTV190 - Cascade Plumbing Schematic; Cascade Instructions

Default Icon
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Boiler and Heating System Piping FTV I&O Manual
54
13.0 CASCADE INSTRUCTIONS
The FTV controller has the internal capacity to cascade (lead-lag / stage) up to 16 FTV boilers, without the use of
an external controller. Use the instructions detailed in this section to set-up and install the cascade system.
FTV-Combi cascades heating an Indirect Water Heater (IWH) cannot utilizes an FTV-
Combi as the Manager.
Figure 13-1 Cascade Plumbing Schematic

Table of Contents

Related product manuals