EasyManua.ls Logo

NTI Ti150-200 User Manual

Default Icon
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
NTI TRINITY Ti
INSTALLATION AND OPERATION INSTRUCTIONS
Ti100-200 Boilers and Ti150-200 Combi Models
VERSION DATE: 2013-05-21
TABLE OF CONTENTS
1.0 SPECIFICATIONS ........................................................................................... 4
2.0 BOILER LOCATION ....................................................................................... 5
3.0 GENERAL VENTING ...................................................................................... 6
4.0 VENT/AIR-INTAKE TERMINATION CLEARANCES ............................ 15
5.0 CONDENSATE DRAIN ................................................................................. 19
6.0 INSTALLING GAS PIPING .......................................................................... 20
7.0 LIGHTING THE APPLIANCE ..................................................................... 21
8.0 GAS VALVE AND BURNER SET-UP ......................................................... 23
9.0 BOILER AND HEATING SYSTEM PIPING .............................................. 26
10.0 COMBI BOILER DHW PLUMBING AND OPERATION ........................ 32
11.0 WIRING ........................................................................................................... 36
12.0 SENTRY 2100 CONTROLLER ..................................................................... 42
13.0 TROUBLESHOOTING .................................................................................. 46
14.0 SEQUENCE OF OPERATION ..................................................................... 49
15.0 WIRING SCHEMATIC ................................................................................. 50
16.0 INSTALLATION CHECKLIST .................................................................... 51
17.0 ANNUAL MAINTENANCE AND INSPECTION ....................................... 52
18.0 PARTS LIST .................................................................................................... 54
HAZARD SYMBOL DEFINITIONS
Danger Sign: Indicates a hazardous situation which, if not avoided, will
result in serious injury or death.
Warning Sign: Indicates a hazardous situation which, if not avoided, could
result in serious injury or death.
Caution Sign plus Safety Alert Symbol: Indicates a hazardous situation
which, if not avoided, could result in minor or moderate injury.
Caution Sign without Safety Alert Symbol: Indicates a hazardous situation
which, if not avoided, could result in property damage.
Notice Sign: Indicates a hazardous situation which, if not avoided could
result in property damage.
H
US Models
NTI # 82419
Question and Answer IconNeed help?

Do you have a question about the NTI Ti150-200 and is the answer not in the manual?

NTI Ti150-200 Specifications

General IconGeneral
BrandNTI
ModelTi150-200
CategoryBoiler
Fuel TypeNatural Gas
Input BTU199, 999 BTU/hr
Heating Capacity150, 000 BTU/h
Efficiency95%
Vent Size2"

Summary

0.0 INTRODUCTION AND GENERAL REQUIREMENTS

General Installation Requirements

General requirements for installing the NTI Trinity Ti gas boiler, adhering to codes.

User and Installer Responsibilities

Outlines responsibilities for users and installers regarding safety and maintenance.

Appliance Vent and Air-Intake Piping

Specifies requirements for direct vent and air intake piping for the appliance.

MASSACHUSETTS SPECIFIC REQUIREMENTS

Massachusetts Venting and Safety Regulations

Specific regulations for gas-fueled equipment in MA, including CO detectors and signage.

1.0 SPECIFICATIONS

High Altitude Operation and De-rating

Guidance on de-rating appliance capacity for installations above 2000 ft.

2.0 BOILER LOCATION

Appliance Installation Clearances and Ventilation

Specifies minimum clearances, ventilation needs for installation areas.

3.0 GENERAL VENTING GUIDELINES

Combustion Air Quality and Venting Materials

Lists sources of contamination to avoid and approved vent piping materials.

Plastic Venting Procedures and Hazards

Addresses hazards and procedures for using flammable solvents with plastic piping.

Venting System Installation Details

Mandatory Plastic Venting Pre-commissioning

Critical steps before powering the boiler for plastic venting systems.

Venting Pipe Length and Termination Options

Allowable Vent Pipe Lengths and Termination Kits

Determines maximum pipe lengths and details optional vent termination kits.

Venting Termination Labeling

Concentric Vent Side Wall Labeling

Guidance on labeling and identification for concentric sidewall terminations.

Venting Termination Identification

Two-Pipe and Optional Kit Labeling

Instructions for labeling two-pipe sidewall and optional kit terminations.

13.0 VENTING RULES AND GUIDELINES

Venting Location and Separation Rules

Ensuring proper vent location, air intake quality, and separation clearances.

Pipe Sizing, Sloping, and Supports

Guidelines for sizing vent pipes, sloping, and providing adequate support.

4.0 VENT/AIR-INTAKE TERMINATION CLEARANCES

Termination Clearance Quick Reference Table

Table summarizing minimum clearances for air inlet and exhaust vent terminations.

Termination Clearance Illustrations

Side Wall Termination Clearance Diagrams

Diagrams illustrating side wall termination clearances above grade.

Common Venting System Procedures

Removing Existing Boiler from Common Venting System

Steps for safely removing a boiler from a common venting system.

5.0 CONDENSATE DRAIN

Condensate Disposal and Trap Requirements

Guidelines for proper connection, disposal, and trap requirements for condensate.

6.0 INSTALLING GAS PIPING

Gas Piping Installation and Sizing

Rules and recommendations for installing gas piping to the appliance.

7.0 LIGHTING THE APPLIANCE

Pre-Operation Safety and Operating Instructions

Crucial safety precautions and step-by-step guide for operating the boiler.

Boiler Start-Up and Shutdown Procedures

Initial Start-Up and Re-lighting Procedures

Steps for first-time lighting, re-lighting, and shutdown of the boiler.

8.0 GAS VALVE AND BURNER SET-UP

Gas Line Pressure Measurement and Control

Procedure to measure gas line pressure for proper burner operation.

Gas Valve Adjustment

Throttle/Input Adjustment Screw Operation

Instructions for adjusting the gas throttle screw for combustion tuning.

Combustion Calibration and Modulation

Calibration, Modulation, and Flue Gas Analysis

Steps for calibrating burner operation, adjusting modulation, and analyzing flue gas.

9.0 BOILER AND HEATING SYSTEMS PIPING

System Preparation, Water Quality, and Treatment

Procedures for preparing, cleaning, and treating the heating system water.

Near Boiler Plumbing Connections

Pressure Relief Valve and Gauge Installation

Instructions for installing pressure relief valve and gauge on the boiler.

Boiler System Plumbing Configuration

Primary/Secondary Loops and Pump Operation

Details on primary/secondary loop plumbing and circulating pump functions.

System Components and Flow Requirements

Circulator Sizing, Air Removal, and LWCO

Guidance on circulator sizing, air removal, and low water cutoff installation.

10.0 COMBI BOILER DHW PLUMBING AND OPERATION

Combi DHW Operation and Plumbing Setup

How the Combi boiler heats DHW and its specific plumbing setup.

Combi DHW Features and Maintenance

DHW Limitations, Storage, and Heat Exchanger Cleaning

Discusses DHW limits, storage feature, and heat exchanger cleaning.

11.0 WIRING AND CONNECTIONS

Line and Low Voltage Connections

Instructions for connecting the 120VAC power supply and low voltage controls.

Zone System Wiring Diagrams

Wiring diagrams for zone valve and circulator systems, with and without controllers.

12.0 SENTRY 2100 CONTROLLER

Sentry 2100 Display and Operation Modes

Explanation of controller display indicators and operating modes.

Sentry 2100 Programming and Settings

Controller Menu, Settings, and Outdoor Sensor

Guide to programming menu items, settings, and outdoor sensor installation.

13.0 TROUBLESHOOTING

Diagnostic Error Codes ER1-ER6

Troubleshooting for specific error codes related to water, ignition, and DHW.

Troubleshooting ER9, Air Switch, Flame Fault, and Boiler Noises

Diagnosing issues with air switches, flame faults, boiler noises, and blank displays.

Boiler Noise and Display Issues

Addressing boiler noises, rough operation, and blank display problems.

14.0 SEQUENCE OF OPERATION

Trinity Boiler Operational Sequence Flow

Detailed flow chart of the boiler's operational sequence.

15.0 WIRING SCHEMATIC

16.0 INSTALLATION CHECKLIST

Installation Checklist

A checklist for ensuring all installation steps are completed correctly.

Start-Up and Operational Checks

Steps for initial start-up and verifying proper operation.

17.0 ANNUAL MAINTENANCE AND INSPECTION

Annual Inspection and Combustion Chamber Cleaning

Checklist for annual inspection and procedure for cleaning the combustion chamber.

Refractory Ceramic Fiber Handling Precautions

RFC Handling, PPE, and First Aid

Recommended PPE, precautions, and first aid for handling refractory ceramic fibers.

18.0 PARTS LIST

Related product manuals