EasyManuals Logo

NTI Trinity Ti 100 User Manual

Default Icon
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1.0 SPECIFICATIONS..................................................................................................2
1.1 HIGH ALTITUDE OPERATION..................................................................................2
2.0 INSTALLATION REQUIREMENTS ...................................................................2
3.0 VENTING .................................................................................................................4
3.1 VENT PIPE MATERIAL ............................................................................................4
3.3 VENTING RULES AND GUIDELINES .........................................................................7
3.4 VENTING CLEARANCES ..........................................................................................7
4.0 CONDENSATE DRAIN..........................................................................................9
5.0 INSTALLING GAS PIPING...................................................................................9
5.0 INSTALLING GAS PIPING.................................................................................10
5.1 INSTALLATION......................................................................................................10
5.2 TESTING AND SETTINGS ........................................................................................10
6.0 HEATING SYSTEM PIPING...............................................................................12
6.1 PRIMARY LOOP PLUMBING...................................................................................13
6.2 SECONDARY LOOP HEATING SYSTEM ..................................................................16
6.2.1 Multiple Zones using Zone Valves.............................................................16
6.2.2 Multiple Zones using Pumps......................................................................16
6.2.3 Multiple Zones with Different Temperatures............................................17
6.3 DOMESTIC COMBI SYSTEM...................................................................................18
7.0 WIRING..................................................................................................................20
7.1 SIMPLIFIED WIRING CONNECTIONS......................................................................21
7.2 ADVANCED WIRING SYSTEMS..............................................................................22
7.2.1 Multiple 4 wire Zone Valves.......................................................................22
7.2.2 Multiple Zones with Taco Valve controller................................................23
7.2.3 Multiple Zones Pump controller................................................................24
7.2.4 Multiple Temperature Zones with Injection Pumps..................................25
8.0 SENTRY 2100 CONTROLLER ...........................................................................26
9.0 LIGHTING BOILER.............................................................................................30
9.1 INITIAL START-UP.................................................................................................30
9.2 RE-LIGHTING UNIT...............................................................................................30
9.3 TURN OFF BOILER.................................................................................................30
10.0 TROUBLE SHOOTING......................................................................................31
11.0 SEQUENCE OF OPERATION ..........................................................................34
14.0 ANNUAL MAINTENANCE AND INSPECTION............................................36
14.1 COMBUSTION CHAMBER CLEANING...................................................................36
15.0 PARTS LIST.........................................................................................................37
CAUTION:
IT IS THE RESPONSIBILITY OF THE HOMEOWNER TO
KEEP THE VENT TERMINAL CLEAR OF SNOW AND ICE.
Trinity Ti Boiler Only
VERSION DATE: 1-5-2010
Installation and
Operation Instructions
Trinit
y
Ti
This Boiler must be installed by a licensed and trained Heating
Technician; otherwise the warranty of this unit is void. Failure
to properly install this unit could cause damage to property
and injury to occupants possibly resulting in death.

Other manuals for NTI Trinity Ti 100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NTI Trinity Ti 100 and is the answer not in the manual?

NTI Trinity Ti 100 Specifications

General IconGeneral
BrandNTI
ModelTrinity Ti 100
CategoryBoiler
LanguageEnglish

Related product manuals