Do you have a question about the NTI Trinity Tx200 and is the answer not in the manual?
Best practices for installing a direct vent system for the boiler.
Procedure for preparing plastic venting systems before boiler startup.
Details on different sidewall termination configurations for direct venting.
Details on different roof termination configurations for direct venting.
Specific details and diagrams for sidewall vent terminations.
Specific details and diagrams for roof vent terminations.
Detailed steps for installing the condensate trap and connecting the drain line.
Details conversion kits and orifices required for LP propane operation.
Critical safety information to read before attempting to operate the boiler.
Step-by-step guide for safely starting and operating the boiler.
Steps for calibrating burner combustion using a CO2 analyzer.
Procedure for adjusting the throttle screw to calibrate CO2 at maximum modulation.
Procedure for adjusting the offset screw to calibrate CO2 at minimum modulation.
Checklist for installation, startup, and operational verification.
Safety precautions and steps to diagnose why the boiler is not operating.
Best practices for installing a direct vent system for the boiler.
Procedure for preparing plastic venting systems before boiler startup.
Details on different sidewall termination configurations for direct venting.
Details on different roof termination configurations for direct venting.
Specific details and diagrams for sidewall vent terminations.
Specific details and diagrams for roof vent terminations.
Detailed steps for installing the condensate trap and connecting the drain line.
Details conversion kits and orifices required for LP propane operation.
Critical safety information to read before attempting to operate the boiler.
Step-by-step guide for safely starting and operating the boiler.
Steps for calibrating burner combustion using a CO2 analyzer.
Procedure for adjusting the throttle screw to calibrate CO2 at maximum modulation.
Procedure for adjusting the offset screw to calibrate CO2 at minimum modulation.
Checklist for installation, startup, and operational verification.
Safety precautions and steps to diagnose why the boiler is not operating.
| Boiler Type | Condensing |
|---|---|
| Fuel Type | Natural Gas or Propane |
| AFUE | 95% |
| Heat Exchanger Material | Stainless Steel |
| Efficiency | 95% AFUE |
| Maximum Input | 199, 000 BTU/hr |
| Heating Capacity | 180, 000 BTU/h |
| Max Water Temperature | 194°F |






Loading...