EasyManua.ls Logo

Nuova Simonelli PRONTOBAR - Page 2

Nuova Simonelli PRONTOBAR
10 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION AND WARRANTY CERTIFICATE
Machine model ___________________ Serial Number # _________________________
Rating and optional ________________________________________________________
Installation Company: ______________________________________________________
Technician ID: ____________________________________ Date: ____/ ____/ _________
Water-Line Pressure: _______________________________________________________
NOTE: over 5bar/70psi, a pressure regulator must be installed
Water Quality: ____________________________________________________________
NOTE: The water hardness must be less then 6° fr (French degrees).
The chlorine content must not exceed 100mg per litre (0.00000361lb/cu in).
At customer: _______________________________________________________________
Shop Manager: ____________________________________________________________
City: _____________________________________________________________________
Address: __________________________________________________________________
__________________________________________________________________________
Preventive Maintenance (PM) Schedule
As recommended by Nuova Simonelli, PMs should be scheduled in 3 months intervals for
super-automatics to keep the machine operating at the highest level as described in the
Standard preventive Maintenance.
The above installation company agrees to perform _____ PMs for every year.
Customer Signature _______________________ Installer Signature __________________

Other manuals for Nuova Simonelli PRONTOBAR

Related product manuals