INSTALLATION AND WARRANTY CERTIFICATE
Machine model ___________________ Serial Number # _________________________
Rating and optional ________________________________________________________
Installation Company: ______________________________________________________
Technician ID: ____________________________________ Date: ____/ ____/ _________
Water-Line Pressure: _______________________________________________________
NOTE: over 5bar/70psi, a pressure regulator must be installed
Water Quality: ____________________________________________________________
NOTE: The water hardness must be less then 6° fr (French degrees).
The chlorine content must not exceed 100mg per litre (0.00000361lb/cu in).
At customer: _______________________________________________________________
Shop Manager: ____________________________________________________________
City: _____________________________________________________________________
Address: __________________________________________________________________
__________________________________________________________________________
Preventive Maintenance (PM) Schedule
As recommended by Nuova Simonelli, PMs should be scheduled in 3 months intervals for
super-automatics to keep the machine operating at the highest level as described in the
Standard preventive Maintenance.
The above installation company agrees to perform _____ PMs for every year.
Customer Signature _______________________ Installer Signature __________________