EasyManua.ls Logo

NuTone 349BR - Page 3

NuTone 349BR
5 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MODEL 349BR
Page 3
6. Cut out the shingles inside of the circle.
7. Replace template over guide hole and draw a 14
7
/8"di-
ameter circle on the black paper or roof boards using the
smaller half of the template.
8. Drill a large starting hole for the sabre saw just inside of
the line.
9. Cut out the roof board(s) inside of the line. Do not cut
rafters.
10. Forproperremovalofroongnails,drawa25
3
/8" square,
centered around the hole. Remove nails holding shingles
down from top two-thirds of square.
11. Slidetheashingundertheshingles.Starttwo-thirds
of the way down from the top of the 25
3
/8" square. Do
not bend the shingles any more than necessary. Center
the ventilator over the hole.

Related product manuals