EasyManua.ls Logo

NuTone 9417DNM - Operation

NuTone 9417DNM
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
OPERATION
Before using heater, make sure heater has been properly installed according to
installation steps beginning with the "PLANNING" section on page 1.
Two-bulb units can be fitted with one infrared bulb (for heat) and one reflector
bulb (for light). Dual or multi-controls can be used for separate control of bulbs
and/or exhaust fan. Purchase controls separately.
MODELS 9417DNM & 9425WHC OPERATION NOTE: These units are de-
signed with a thermostat which senses excess heat and may start the blower
automatically. This is normal and is no cause for concern.

Related product manuals