INSTALLATION
How To Install Your OdorStop UV Air Treatment System
Ifyourheating/cooling(HVAC)systemisequippedwithair
conditioning,itisrecommendedthattheUVAirTreatment
System (unit) be mounted directly above the cooling coil. The
OS36/OS72 can prevent the growth of a high percentage
of micro-organisms such as mold, bacteria and viruses on
surfaces such as cooling coils, drain pans and duct work.
Selecting Mounting Location
1. The unit can be mounted in any orientation, but should be
mountedinawaythattheLEDindicatorlight(s)canbeseen.
2. Choose a location that will make changing/cleaning of the
UVbulb(s)easy.
3.InstallunitonaatsurfaceoftheductworkABOVEtheair
conditioningcoolingcoil(“ACoil”)ifyourHVACsystemhas
airconditioning.IfyourHVACsystemdoesnothaveair
conditioning, the unit should be installed on the supply air
duct if possible. The unit can be installed on a return air duct
if necessary.
CAUTION: DONOTinstalltheunitinthe“Acoil”orunder
ahumidierasdamagemayoccur.Ifyouareunsureif
youhavechosenacorrectmountinglocation,refertoyourHVACsystem’sownersmanualorcalla
qualiedprofessionalforassistance.
4.Selectamountinglocationthathasaminimumdepthof17inches.TheUVbulbis16incheslongand
must have adequate clearance.
5.BesuretolocatetheunitawayfromanyplasticorrubbercomponentsthatmaybedamagedbyUV
light. If mounting options are limited, plastic and rubber may be covered with aluminum foil duct tape in
ordertoprotectthemfromtheUVlight.
6.Theunithasa6footlongpowercordandmustbeinstalledwithinreachofa120Voltgroundedpower
outlet.Haveaqualiedprofessionalinstallaproperlygroundedpoweroutletifthereisnotonewithin
range of the power cord.
Included:
•UVUnit
•4SheetMetalMountingScrews
•UVlamp(s)-1forOS36,2forOS72
•SpareFuse
•InstructionManual
Tools Required For Installation:
•Drill
•1/4”NutDriver
•3/32”DrillBit
•21/2”MetalCuttingHoleSaw
2